Monday, 14 November 2016

Getting ready for the SIPs



Another week on since the last post.

The SIPs (structurally insulated panels) are being delivered on Wednesday. 


The first load of SIPs awaiting delivery

Unfortunately we don't have space on site to offload the panels from this curtain sided vehicle, so we've had to arrange for the load to be transferred onto a trailer by a local haulier in Cranleigh, once they arrive from Yorkshire. Yet more unforeseen expense!

So this week has been about completing the block work around the outside of the frame that the SIPs will sit on.



The front door

The dining area - there will be glazed panels on the right


This will be the patio door from the dining area

Block work in the kitchen

View of the garden

View of sitting room sling brace from scaffolding

View of walkway and dining area below

View of sling brace

Details of chisel marks on frame - an oversized jigsaw puzzle!


Our bedroom above and kitchen below

Looking West across to walkway

Upstairs


Looking from our bedroom to kitchen and dining area below

More chisel marks

Looking through sling brace towards the garage

Walkway 

King post

Sitting area

Looking over to walkway. Garage on left. Dining area on right.

It was a lovely sunny day when we visited but there had been a lot of rain the previous day. All of the water in the garden appears to be running down the (gently) sloping garden towards the house!

We've also had the bathroom designs this week. There are still some tweaks to make, but they're almost there.

Family bathroom

Family bathroom

Master en suite

Master en suite

Master en suite


Oh! and we've bought the bath - as there was 40% off in the sale. We just need to work out where we're going to put it for the next 6 months or so!

We've chosen the clay roof tiles - Sandtoft Barrow Dark Rusper from Wienerberger.

Exciting stuff!





No comments: