Monday, 31 October 2016

The Ground Floor and a bit of frame

Our floor slab

Julian celebrated his 50th birthday in Sitges. Thank you Penny and Jonny for organising a fantastic long weekend!




The beam and block floor was completed in late October and we arranged for a family visit while mum and dad were down for half term.

Standing in the middle of the kitchen

From the garden looking into the kitchen


Looking towards the sitting room


Towards the dining area



The garage

The garage

The front of the house


We spent a week down in Devon and the oak frame arrived on site on 27 October. In just a couple of days almost half of the ground floor frame has been erected.







Looking through the sitting room towards the garage. Can we get three cars in a two car garage?

The stairs will descend into here

This will be the patio doors from the dining area. The big slot on the right is for our sling brace.


Hoskins Old Farmhouse bricks (made in Holland!!)
Julian in the entrance area looking towards the dining/sitting area




Patio and dining area


Two wind braces. Every joint is connected by wooden pegs

Sitting on the verandah

Unfortunately this post has missed the concrete pad, So far the rest are spot on.

We expect the frame to be completed in around a week and a half and the SIPs should be arriving in mid November.

We've just ordered the roof lantern from Vitral, which will be above the main vaulted living area. 

We need to make the final decision on the roof tiles as this is another part of the build that's over the budget.