Monday, 13 February 2017

Rooflights


Most of the rooflights are in now, just the ones in our bedroom to go in.

Front of house



Bedroom 3

Bedroom 2

Shower room

Bathroom and bedroom 1



Bedroom 1
The builders have started to batten the exterior walls ready for the oak featherboard cladding and have started the brick work.







The glazing on the living room gable and the bifold doors in our bedroom have been installed.





Patio doors in dining area



Mum and dad came to visit with Julie, Sabel and Daniela.


We've started some mood boards to plan the interior.

Kitchen

Bathroom

Shower room

Ensuite

Ground floor shower room

Sunday, 5 February 2017

Roof tiles and flue


The roof tiles are going on pretty quickly. Most of the northern elevation have been done and the western end of the south side.

Back of house

Front of house

The hole has been cut for the flue for the wood burner.




The internal walls upstairs are being erected.

Family bathroom

Dressing area


Looking through ensuite to family bathroom

Dressing area through to master bedroom



The Fakro rooflights have arrived and should be fitted next week.


Sunday, 29 January 2017

The windows and doors are going in ...............


The windows and skylight are in. The rooflights and upstairs bifolds should be in during the next couple of weeks.







Sitting room bifolds






Dining area




Kitchen patio doors




Sitting room




Bedroom 1






The roof tiles should also be on by next week and the flue is being installed on Thursday.












Sitting room

Stairs

Walkway

Master bedroom

Walkway and skylight

Bedroom 1

Family bathroom

Ensuite, family bathroom & bedroom 1

Bedrooms 2 & 3

Shower room

Bedroom 3