Saturday, 13 May 2017

Bathrooms & downstairs partition walls



There's been a lot of work done on the bathrooms this week, with some of the plumbing going in and the tile layouts marked up. Most of the bathroom tiles have arrived, as well as the stone floor tiles for the ground floor.


Master ensuite


Family bathroom

Family bathroom







Family bathroom



Shower room - beds 2/3


Shower room - beds 2/3

The downstairs partition walls have gone in and are being plaster boarded.



Entrance

Utility

Utility on the left & kitchen

TV room

TV room

Kitchen

Kitchen

Utility


The fire wall to the garage has been put up.





Outside the drainage is being put in and the rubble has been removed from the back of the house.





Sunday, 7 May 2017

Underfloor heating & scaffolding



The scaffolding is down and without it the house looks bigger from the back.
















The garage doors are on but still need painting.





The underfloor heating is in downstairs, as well as upstairs.










The bathroom sanitary ware has arrived!




The concrete screed has also just been laid downstairs and the partition walls are going in.



Dining area

Utility room into kitchen

TV room

Kitchen into utility room

Entrance

Kitchen

Kitchen


Kitchen


TV room

Utility room


Kitchen & utility room






Living room

Dining area


Living area
Ensuite shower room

Master bedroom


Family bathroom

Shower room - beds 2 & 3

Shower room - beds 2 & 3


Towards beds 2 & 3

Master bedroom