There's been a lot of work done on the bathrooms this week, with some of the plumbing going in and the tile layouts marked up. Most of the bathroom tiles have arrived, as well as the stone floor tiles for the ground floor.
Master ensuite |
Family bathroom |
Family bathroom |
Family bathroom |
Shower room - beds 2/3 |
Shower room - beds 2/3 |
The downstairs partition walls have gone in and are being plaster boarded.
Entrance |
Utility |
Utility on the left & kitchen |
TV room |
TV room |
Kitchen |
Kitchen |
Utility |
The fire wall to the garage has been put up.
Outside the drainage is being put in and the rubble has been removed from the back of the house.